Showing posts with label leak. Show all posts
Showing posts with label leak. Show all posts

13 December 2013

installed!

after my rant/whine this morning, I feel the need to follow up.  the old adage, the squeaky wheel gets the grease held true.  another tech came out around 2, and they were able to reassemble our laundry room and kitchen in 2 hours without any problem.

the floor looks great!  I'd forgotten how nice it is to have floor covering = )


before. we were perfectly content with our floors, particularly since it didn't cost us anything to keep them.

after they ripped it up, this is what the floor looked like for 2 months (luckily I was not here during most of that time.)

after.  I don't know if it is because I had to live with something so horrible for a month, or if it really does look way better than what we had, but either way I love it!
so, I can now say I feel much better, and we are still on schedule for our carpet install on Tuesday!

later days

vinyl installation: a rant

okay, so we had a leaky pipe 5 MONTHS ago.  they took care of it quickly, but left us with missing carpet in 3 rooms of our house.  our vinyl was backordered, and we ended up waiting almost a month before the install.

when they did finally come out, they tore out our old vinyl, then informed me we had a wet spot and they couldn't put in the new.  I had to call the company to have them send out the techs to put back in my washer & dryer (because it didn't occur to them that with 3 children I might need them before we were able to fix the new problem.)

they found the new spot 5 days before we were to leave for California. billy's dad is very handy, and since I was due to be gone the month of October [read: the lack of vinyl would not be triggering my control issues] we decided to wait until they came down for William's birthday the 2nd weekend of November.  sadly, my mil is vital in the lives of several families in anson, and they had to reschedule their trip for thanksgiving.

since we were gone almost an entire week right before then, and we were so thrilled to be home for the two weeks we were, my issues were kept in check.  they were able to fix our tub (at least for the time being) so that I could call and reschedule the vinyl.

customer service on the phone is very good, we set up a vinyl appointment for today and yesterday, and carpet installation for next Tuesday.*  when the tech arrived yesterday (at 9:30, an hour after the estimated time) I was a little annoyed, and flabbergasted that they would send out a single worker for a two day job.

he spent the morning disconnecting our appliances, wheeling them into our dining area, and cutting up more carpet in the process (yay.)  after an hour lunch, he finished taking out the doors, and measured and cut the vinyl.  this took the rest of the day, and when he closed up his van at 420, I'm like really?

since alice has school today, I asked him to come at about the same time, and rushed home from drop off to meet him. at 10am when he arrived he indicated to me that he probably wouldn't finish today. um, no.

I explained that I need my washer and dryer over the weekend.  I called the company to see if they could send out another tech to help him, since moving the appliances was going to be his hang up.  the same lady that gave me such great service previously explained that they are really booked due to the holiday, and she'd see what she can do.  look, you estimated 2 days, not me, maybe you should have sent out more than one tech?  at this point she asked to speak with the tech, and we might have a guy come out to help him this afternoon.

I reiterated that I needed my washer and dryer to both of them, so that they know I will be making angry phone calls if this is not taken care of. I think I can deal, aggregately so, with the refrigerator and other things being out place over the weekend.

Monday, they will only have few hours to work in the afternoon, because while the girls are in school, William and I have two appointments to meet that morning.  I will not be home until 2.  and let me say this now, I'm keeping my carpet appointment.  the vinyl people will just have a harder job if they take longer than today and Monday. 

it is winter, our room is very cold (since we're missing about 1/3 of the carpet) and I've waited 5 months for this.

that helped a bit, we'll see how I feel when he leaves today.

later days

*since the carpet overlaps the vinyl, we have to have the vinyl in before they can lay the carpet.

17 July 2013

leaky pipes: a saga of not so epic preportions

i'm kind of a 'big picture' person, and not really a fan of posting a story before it's conclusion, but this particular chapter in our lives might last several months, and I would hate to forget some of the details before sharing it on the internet.

our 'trouble' actually started last Saturday.  billy and I noticed 2 cd-sized wet spots in our vanity, but having 2 toddlers running around, assumed that it was likely a spill by one or both of them.  sunday morning we woke up to a squishy carpet throughout the vanity area.  we called the plumbers and made an appointment for Monday morning.

vanity

closet

entrance to our bedroom

laundry room


more laundry room

kitchen

pantry

the plumber came out did a preliminary diagnosis, and gave us an estimate for fixing our air conditioner condensation drain pipe.  it was for a little under $600, which is manageable, but not fun.  then he told me that the damage to our carpet, walls, etc. would also have to be fixed, but that part of the project could be an insurance claim.  he also blew some air into the pipe before he left, to clear out any blockages.

the next worker that came out from their company is in charge of the restoration team.  during his visit I contacted our home owners insurance company to start a claim. they started the process of getting an adjuster out to our house. then, he set up a team to come out at 5 that evening (it was about 3 when he left.)*

the third person from their company came to tear up our carpet & take off the baseboards in our vanity, bathroom, closet, laundry room & pantry.  he drilled some small holes in the wall to help it dry out, then set up 8 fans and 3 de-humidifiers.  before he left he indicated that he would be back to tear up the linoleum in the kitchen as well.

length of vanity (you can see the wet spot there at the end)

entrance to vanity

doorway to our bedroom

pantry

kitchen

laundry room


the contents of our closet are now spread all across our bedroom, making life a smidge difficult. the fans are annoying, since there are so many of them, but at least we won't have to deal with mold.  the de-humidifiers are amazing, last night our thermostat was reading "76" (F) and I had to grab a blanket because it was so chilly.

luckily we were repair company free Tuesday, but there is still a puddle of water right outside our bathroom, and with all the fans blowing, meant we the water was still coming out.**

which brings us to today (Wednesday.)  the plumber got here just after 8am and  did his own inspection.  while he agreed that it had all the signs of an air conditioner condensation pipe drain issue, he went looking for another leak, because there was still standing water in the vanity. 

after giving us a new estimate (this time at just under $1000) he started cutting up the wall on the back side of our counter.  he's pulled out 10ft of pipe so far, and found 4 holes in that length of pipe.

the back side of my kitchen counter
I will be soooooooooo miserable if I have to empty my kitchen cabinets or my pantry. 


 
the plumber is still taking out pipe, making holes and lots of noise!  luckily William is asleep at thte other end of the house and Emily is wrapped up in her blanket on my lap.

the insurance adjuster is due in about 15 minutes, and now I do have some questions for him!

<i'll update here as the saga continues>

later days

*because of the time he came out, Emily had to miss swim lessons on Monday.
**we went to swim lessons, but the pool was closed due to lightening on Tuesday.